TAP149667

Substation

Texas

Max voltage
161
kV

TAP149667 is an electric transmission substation in Texas. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates35.3097, -94.3698

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13211161 kVIN SERVICE0.9 mi
#13223161 kVIN SERVICE0.6 mi
#13226161 kVIN SERVICE2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP149667, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP149667 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FORT SMITHSubstation-AdjacentOKSequoyah County500 kV1,000 MW3.4 yrs74.4
UNKNOWN107800Substation-AdjacentARSebastian County161 kV100 MW3.4 yrs67.0
UNKNOWN121673Substation-AdjacentARCrawford County161 kV100 MW3.4 yrs66.8
TAP149665Substation-AdjacentARSebastian County161 kV100 MW3.4 yrs66.7
Greenfield (MUSKOGEE - FORT SMITH)GreenfieldOKSequoyah County345 kV600 MW3.4 yrs66.7
Greenfield (FORT SMITH - ARKANSAS NUCLEAR )GreenfieldARSebastian County500 kV1,000 MW3.4 yrs66.6
THIRD STREETSubstation-AdjacentARSebastian County161 kV100 MW3.4 yrs66.6
BATTLEFIELDSubstation-AdjacentARSebastian County161 kV100 MW3.4 yrs66.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP149667 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.