TAP149389

Substation

Texas · SOUTHWESTERN POWER ADMINISTRATION

Max voltage
161
kV

TAP149389 is an electric transmission substation in Texas, operated by SOUTHWESTERN POWER ADMINISTRATION. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorSOUTHWESTERN POWER ADMINISTRATION
StateTexas
Coordinates35.8016, -95.2169

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#8177161 kVSOUTHWESTERN POWER ADMINISTRATIONIN SERVICE4.8 mi
#8192161 kVSOUTHWESTERN POWER ADMINISTRATIONIN SERVICE7.4 mi
#8314161 kVSOUTHWESTERN POWER ADMINISTRATIONIN SERVICE16.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP149389, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP149389 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PECAN CREEKSubstation-AdjacentOKMuskogee County345 kV600 MW3.4 yrs72.7
CLARKSVILLESubstation-AdjacentOKWagoner County345 kV600 MW3.4 yrs70.9
TAP149389Substation-AdjacentOKCherokee County161 kV100 MW3.4 yrs70.2
UNKNOWN119169Substation-AdjacentOKMuskogee County161 kV100 MW3.4 yrs69.6
UNKNOWN119088Substation-AdjacentOKWagoner County161 kV100 MW3.4 yrs69.6
UNKNOWN118448Substation-AdjacentOKCherokee County161 kV100 MW3.4 yrs69.6
UNKNOWN119301Substation-AdjacentOKWagoner County138 kV100 MW3.4 yrs69.6
UNKNOWN119010Substation-AdjacentOKWagoner County161 kV100 MW3.4 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP149389 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.