TAP149051

Substation

Texas · OKLAHOMA GAS & ELECTRIC CO

Max voltage
138
kV

TAP149051 is an electric transmission substation in Texas, operated by OKLAHOMA GAS & ELECTRIC CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorOKLAHOMA GAS & ELECTRIC CO
StateTexas
Coordinates34.0383, -96.2074

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3458138 kVOKLAHOMA GAS & ELECTRIC COIN SERVICE3.3 mi
#39701138 kVOKLAHOMA GAS & ELECTRIC COIN SERVICE15.7 mi
#50510138 kVOKLAHOMA GAS & ELECTRIC COIN SERVICE9.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP149051, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP149051 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLEVELANDSubstation-AdjacentOKBryan County345 kV600 MW3.4 yrs70.4
UNKNOWN118773Substation-AdjacentOKBryan County138 kV100 MW3.4 yrs67.2
UNKNOWN175146Substation-AdjacentOKBryan County138 kV100 MW3.4 yrs67.0
UNKNOWN118774Substation-AdjacentOKBryan County138 kV100 MW3.4 yrs66.7
Greenfield (KIAMICHI STATION - UNKNOWN3013)GreenfieldOKBryan County345 kV600 MW3.4 yrs66.5
UNKNOWN118772Substation-AdjacentOKBryan County138 kV100 MW3.4 yrs66.4
TAP141988Substation-AdjacentOKBryan County138 kV100 MW3.4 yrs66.2
UNKNOWN118836Substation-AdjacentOKMarshall County138 kV100 MW3.4 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP149051 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.