TAP149049
SubstationTexas · PUBLIC SERVICE CO OF OKLAHOMA
TAP149049 is an electric transmission substation in Texas, operated by PUBLIC SERVICE CO OF OKLAHOMA. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #11045 | 138 kV | PUBLIC SERVICE CO OF OKLAHOMA | IN SERVICE | 24.2 mi |
| #11048 | 138 kV | PUBLIC SERVICE CO OF OKLAHOMA | IN SERVICE | 9.3 mi |
| #48308 | 138 kV | PUBLIC SERVICE CO OF OKLAHOMA | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP149049, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| HUGO (345 KV) | Substation-Adjacent | OK | Choctaw County | 345 kV | 600 MW | 3.4 yrs | 69.6 |
| UNKNOWN300188 | Substation-Adjacent | TX | Lamar County | 345 kV | 600 MW | 3.4 yrs | 67.2 |
| UNKNOWN118754 | Substation-Adjacent | OK | McCurtain County | 138 kV | 100 MW | 3.4 yrs | 66.4 |
| Greenfield (HUGO (345 KV) - VALLIANT) | Greenfield | OK | McCurtain County | 345 kV | 600 MW | 3.4 yrs | 65.8 |
| UNKNOWN118751 | Substation-Adjacent | OK | McCurtain County | 138 kV | 100 MW | 3.4 yrs | 65.4 |
| VALLIANT | Substation-Adjacent | TX | Red River County | 345 kV | 600 MW | 3.4 yrs | 65.2 |
| Greenfield (HUGO (345 KV) - SUNNYSIDE) | Greenfield | OK | Choctaw County | 345 kV | 600 MW | 3.4 yrs | 64.8 |
| LAMAR POWER PROJECT | Substation-Adjacent | TX | Lamar County | 138 kV | 100 MW | 3.4 yrs | 64.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP149049 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.