TAP149039

Substation

Texas

Max voltage
138
kV

TAP149039 is an electric transmission substation in Texas. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates34.4213, -96.8797

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3992138 kVIN SERVICE0.6 mi
#54712138 kVIN SERVICE13.2 mi
#54715138 kVIN SERVICE2.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP149039, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP149039 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN118834Substation-AdjacentOKJohnston County345 kV600 MW3.4 yrs67.2
UNKNOWN119705Substation-AdjacentOKMarshall County138 kV100 MW3.4 yrs66.7
UNKNOWN118836Substation-AdjacentOKMarshall County138 kV100 MW3.4 yrs66.2
Greenfield (HUGO (345 KV) - SUNNYSIDE)GreenfieldOKJohnston County345 kV600 MW3.4 yrs65.0
Greenfield (HUGO (345 KV) - SUNNYSIDE)GreenfieldOKCarter County345 kV600 MW3.4 yrs65.0
TAP149041Substation-AdjacentOKCarter County138 kV100 MW3.4 yrs64.9
Greenfield (UNKNOWN118834 - SUNNYSIDE)GreenfieldOKCarter County345 kV600 MW3.4 yrs64.9
Greenfield (HUGO (345 KV) - SUNNYSIDE)GreenfieldOKMurray County345 kV600 MW3.4 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen