TAP148807

Substation

Texas · OKLAHOMA GAS & ELECTRIC CO

Max voltage
345
kV

TAP148807 is an electric transmission substation in Texas, operated by OKLAHOMA GAS & ELECTRIC CO. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorOKLAHOMA GAS & ELECTRIC CO
StateTexas
Coordinates35.4390, -95.7861

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6005345 kVIN SERVICE9.3 mi
#19265345 kVIN SERVICE12.4 mi
#26929345 kVOKLAHOMA GAS & ELECTRIC COIN SERVICE109.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP148807, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP148807 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PECAN CREEKSubstation-AdjacentOKMuskogee County345 kV600 MW3.4 yrs72.7
TAP148807Substation-AdjacentOKMcIntosh County345 kV600 MW3.4 yrs72.6
UNKNOWN119169Substation-AdjacentOKMuskogee County161 kV100 MW3.4 yrs69.6
Greenfield (MUSKOGEE - PECAN CREEK)GreenfieldOKMuskogee County345 kV600 MW3.4 yrs68.4
Greenfield (TAP149385 - UNKNOWN159849)GreenfieldOKMcIntosh County345 kV600 MW3.4 yrs68.2
UNKNOWN119165Substation-AdjacentOKMuskogee County161 kV100 MW3.4 yrs67.9
Greenfield (TAP148807 - SEMINOLE)GreenfieldOKMcIntosh County345 kV600 MW3.4 yrs67.8
UNKNOWN118942Substation-AdjacentOKOkfuskee County138 kV100 MW3.4 yrs67.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP148807 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.