TAP142332

Substation

Texas · SOUTHWESTERN ELECTRIC POWER CO

Max voltage
138
kV

TAP142332 is an electric transmission substation in Texas, operated by SOUTHWESTERN ELECTRIC POWER CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorSOUTHWESTERN ELECTRIC POWER CO
StateTexas
Coordinates33.7131, -94.0152

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#32645138 kVSOUTHWESTERN ELECTRIC POWER COIN SERVICE0.0 mi
#36479138 kVSOUTHWESTERN ELECTRIC POWER COIN SERVICE5.6 mi
#61533138 kVSOUTHWESTERN ELECTRIC POWER COIN SERVICE14.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142332, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142332 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN123543Substation-AdjacentARHempstead County345 kV600 MW3.4 yrs71.7
TAP150157Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs70.5
UNKNOWN108045Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs70.3
UNKNOWN108048Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs70.1
Greenfield (UNKNOWN123543 - NORTHWEST TEXA)GreenfieldARHempstead County345 kV600 MW3.4 yrs68.9
UNKNOWN108046Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs68.8
UNKNOWN150150Substation-AdjacentARMiller County138 kV100 MW3.4 yrs67.4
SUGAR HILLSubstation-AdjacentARMiller County138 kV100 MW3.4 yrs67.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142332 substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.