TA53

Substation

Texas · JEMEZ MOUNTAIN ELECTRIC COOPERATIVE

Max voltage
115
kV

TA53 is an electric transmission substation in Texas, operated by JEMEZ MOUNTAIN ELECTRIC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorJEMEZ MOUNTAIN ELECTRIC COOPERATIVE
StateTexas
Coordinates35.8700, -106.2680

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81114115 kVJEMEZ MOUNTAIN ELECTRIC COOPERATIVE1.4 mi
#86299115 kVJEMEZ MOUNTAIN ELECTRIC COOPERATIVE3.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TA53, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TA53 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIGUEL LUJANSubstation-AdjacentNMSanta Fe County230 kV300 MW3.4 yrs67.1
Greenfield (OJO - TAOS)GreenfieldNMTaos County345 kV600 MW3.4 yrs64.4
MIGUEL LUJAN TAP (NS LINE)Substation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs64.0
MEJIASubstation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs63.9
Greenfield (NORTON - B-A)GreenfieldNMSanta Fe County345 kV600 MW3.4 yrs63.4
SOUTH PACHECOSubstation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs63.3
OJOSubstation-AdjacentNMLos Alamos County345 kV600 MW3.4 yrs62.2
ELDORADOSubstation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.