SOUTH MCALLEN

Substation

Texas · AEP

Max voltage
138
kV

SOUTH MCALLEN is an electric transmission substation in Texas, operated by AEP. It is classified as sub-transmission (138 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines6

Ownership & operation

OperatorAEP
Co-ownerAEP TEXAS
Co-ownerAEP TEXAS CENTRAL CO.
StateTexas
Coordinates26.1606, -98.2516

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79860138 kVAEP TEXASIN SERVICE5.6 mi
#82466138 kVAEP TEXASIN SERVICE3.4 mi
#82766138 kVAEP TEXAS CENTRAL CO.IN SERVICE2.6 mi
#83030138 kVAEPIN SERVICE3.3 mi
#85811138 kVAEP TEXAS CENTRAL CO.3.3 mi
#90006138 kVAEP TEXAS CENTRAL CO.3.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SOUTH MCALLEN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SOUTH MCALLEN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH EDINBURGSubstation-AdjacentTXHidalgo County345 kV600 MW3.4 yrs73.5
POMELOSubstation-AdjacentTXHidalgo County345 kV600 MW3.4 yrs70.7
UNKNOWN309640Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.9
SOUIXSubstation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.7
UNKNOWN301271Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.7
WEST MCALLENSubstation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.7
UNKNOWN304555Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.5
UNKNOWN309194Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.