SEALY is an electric transmission substation in Texas, operated by CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
StateTexas
Coordinates29.7791, -96.1708

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82919138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC12.1 mi
#87986138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC5.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SEALY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SEALY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ZENITHSubstation-AdjacentTXWaller County345 kV600 MW3.4 yrs70.9
UNKNOWN308399Substation-AdjacentTXWashington County345 kV600 MW3.4 yrs67.4
UNKNOWN308809Substation-AdjacentTXWaller County138 kV100 MW3.4 yrs66.2
UNKNOWN300814Substation-AdjacentTXWaller County138 kV100 MW3.4 yrs66.0
Greenfield (SINGLETON - ZENITH)GreenfieldTXWaller County345 kV600 MW3.4 yrs65.5
Greenfield (ZENITH - SINGLETON)GreenfieldTXWaller County345 kV600 MW3.4 yrs65.5
KATYSubstation-AdjacentTXWaller County138 kV100 MW3.4 yrs65.4
TAP310802Substation-AdjacentTXWaller County138 kV100 MW3.4 yrs65.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SEALY substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.