SAN JACINTO COUNTY PEAKING FACILITY

Substation

Texas

Max voltage
138
kV

SAN JACINTO COUNTY PEAKING FACILITY is an electric transmission substation in Texas. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

StateTexas
Coordinates30.4193, -95.0118

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#80027138 kVIN SERVICE6.0 mi
#88983138 kVIN SERVICE5.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SAN JACINTO COUNTY PEAKING FACILITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SAN JACINTO COUNTY PEAKING FACILITY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PORTERSubstation-AdjacentTXMontgomery County138 kV100 MW3.4 yrs68.5
Greenfield (KING REIT - TENASKA FRONTIER S)GreenfieldTXHarris County345 kV600 MW3.4 yrs66.7
JACINTOSubstation-AdjacentTXSan Jacinto County138 kV100 MW3.4 yrs66.3
UNKNOWN302196Substation-AdjacentTXMontgomery County138 kV100 MW3.4 yrs65.9
UNKNOWN300592Substation-AdjacentTXMontgomery County230 kV300 MW3.4 yrs65.3
UNKNOWN305652Substation-AdjacentTXMontgomery County138 kV100 MW3.4 yrs65.2
UNKNOWN308560Substation-AdjacentTXMontgomery County138 kV100 MW3.4 yrs64.7
UNKNOWN308753Substation-AdjacentTXSan Jacinto County138 kV100 MW3.4 yrs64.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.