SAN ANGELO RED CREEK
SubstationTexas · AEP TEXAS NORTH CO.
SAN ANGELO RED CREEK is an electric transmission substation in Texas, operated by AEP TEXAS NORTH CO.. It is classified as high-voltage (345 kv) and connects 10 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #87392 | 345 kV | AEP TEXAS NORTH CO. | IN SERVICE | 17.8 mi |
| #87664 | 345 kV | COLEMAN COUNTY ELEC COOP, INC | IN SERVICE | 50.4 mi |
| #87747 | 345 kV | SHARYLAND UTILITIES LP | — | 70.5 mi |
| #86254 | 345 kV | AEP TEXAS NORTH CO. | IN SERVICE | 17.8 mi |
| #84007 | 345 kV | SHARYLAND UTILITIES LP | — | 70.5 mi |
| #92767 | 138 kV | COLEMAN COUNTY ELEC COOP, INC | IN SERVICE | 15.2 mi |
| #83269 | 138 kV | COLEMAN COUNTY ELEC COOP, INC | IN SERVICE | 10.8 mi |
| #86359 | 138 kV | AEP TEXAS NORTH CO. | IN SERVICE | 7.8 mi |
| #87782 | 138 kV | COLEMAN COUNTY ELEC COOP, INC | IN SERVICE | 32.7 mi |
| #82033 | 138 kV | AEP TEXAS NORTH CO. | IN SERVICE | 6.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of SAN ANGELO RED CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SAN ANGELO RED CREEK | Substation-Adjacent | TX | Tom Green County | 345 kV | 600 MW | 3.4 yrs | 68.5 |
| TWIN BUTTES | Substation-Adjacent | TX | Tom Green County | 345 kV | 600 MW | 3.4 yrs | 67.6 |
| UNKNOWN307491 | Substation-Adjacent | TX | Tom Green County | 138 kV | 100 MW | 3.4 yrs | 64.9 |
| UNKNOWN306497 | Substation-Adjacent | TX | Tom Green County | 138 kV | 100 MW | 3.4 yrs | 64.5 |
| UNKNOWN303554 | Substation-Adjacent | TX | Runnels County | 138 kV | 100 MW | 3.4 yrs | 64.3 |
| TAP310570 | Substation-Adjacent | TX | Tom Green County | 138 kV | 100 MW | 3.4 yrs | 64.1 |
| TAP310849 | Substation-Adjacent | TX | Tom Green County | 138 kV | 100 MW | 3.4 yrs | 63.9 |
| UNKNOWN301311 | Substation-Adjacent | TX | Tom Green County | 138 kV | 100 MW | 3.4 yrs | 63.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for SAN ANGELO RED CREEK substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.