RUTHERFORD

Substation

Texas · BLUEBONNET ELECTRIC COOP, INC

Max voltage
138
kV

RUTHERFORD is an electric transmission substation in Texas, operated by BLUEBONNET ELECTRIC COOP, INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorBLUEBONNET ELECTRIC COOP, INC
StateTexas
Coordinates30.1177, -97.9856

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85349138 kVBLUEBONNET ELECTRIC COOP, INCIN SERVICE4.5 mi
#90754138 kVBLUEBONNET ELECTRIC COOP, INCIN SERVICE8.2 mi
#91690138 kVBLUEBONNET ELECTRIC COOP, INCIN SERVICE9.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RUTHERFORD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RUTHERFORD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PEDERNALESSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs71.5
DECKERSubstation-AdjacentTXTravis County345 kV600 MW3.4 yrs70.8
ZORNSubstation-AdjacentTXGuadalupe County345 kV600 MW3.4 yrs70.0
MCNEILSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs69.6
TAP302710Substation-AdjacentTXTravis County138 kV100 MW3.4 yrs68.6
CENTRAL AUSTINSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs68.6
SPRINKLESubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs68.6
BURLESONSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs68.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen