ROWE

Substation

Texas · CENTRAL NEW MEXICO ELECTRIC COOPERATIVE

Max voltage
115
kV

ROWE is an electric transmission substation in Texas, operated by CENTRAL NEW MEXICO ELECTRIC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorCENTRAL NEW MEXICO ELECTRIC COOPERATIVE
StateTexas
Coordinates35.4514, -105.6296

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#88926115 kVCENTRAL NEW MEXICO ELECTRIC COOPERATIVEIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ROWE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ROWE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTONSubstation-AdjacentNMSan Miguel County345 kV600 MW3.4 yrs69.7
MIGUEL LUJANSubstation-AdjacentNMSanta Fe County230 kV300 MW3.4 yrs67.1
MIGUEL LUJAN TAP (NS LINE)Substation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs64.0
MEJIASubstation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs63.9
SOUTH PACHECOSubstation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs63.3
ELDORADOSubstation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs62.1
MEJIA TAP (NS LINE)Substation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs62.1
TAP302531Substation-AdjacentNMSan Miguel County115 kV100 MW3.4 yrs61.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROWE substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.