RIO GRANDE

Substation

Texas · EL PASO ELECTRIC POWER COMPANY

Max voltage
115
kV

RIO GRANDE is an electric transmission substation in Texas, operated by EL PASO ELECTRIC POWER COMPANY. It is classified as sub-transmission (115 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines7

Ownership & operation

OperatorEL PASO ELECTRIC POWER COMPANY
StateTexas
Coordinates31.8057, -106.5471

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85569115 kV2.7 mi
#86280115 kVIN SERVICE6.1 mi
#88703115 kVEL PASO ELECTRIC POWER COMPANY2.0 mi
#88927115 kVIN SERVICE3.0 mi
#89118115 kVEL PASO ELECTRIC POWER COMPANY4.5 mi
#90290115 kVIN SERVICE1.0 mi
#91661115 kVIN SERVICE0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RIO GRANDE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RIO GRANDE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CALIENTESubstation-AdjacentTXEl Paso County345 kV600 MW3.4 yrs73.2
NEWMANSubstation-AdjacentTXEl Paso County345 kV600 MW3.4 yrs71.5
PICANTESubstation-AdjacentTXEl Paso County345 kV600 MW3.4 yrs71.1
AFTON GENERATING STATIONSubstation-AdjacentNMDoña Ana County345 kV600 MW3.5 yrs69.8
SOLSubstation-AdjacentTXEl Paso County115 kV100 MW3.4 yrs69.5
PENDALESubstation-AdjacentTXEl Paso County115 kV100 MW3.4 yrs68.9
LANESubstation-AdjacentTXEl Paso County115 kV100 MW3.4 yrs68.2
TurbineBrownfieldTXEl Paso121 MW68.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RIO GRANDE substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.