READING

Substation

Texas · CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC

Max voltage
138
kV

READING is an electric transmission substation in Texas, operated by CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
StateTexas
Coordinates29.5637, -95.7625

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81492138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC1.6 mi
#87187138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE3.9 mi
#91440138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of READING, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near READING substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WHITE OAKSubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs73.6
JEANETTASubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs73.0
UNKNOWN304285Substation-AdjacentTXHarris County345 kV600 MW3.4 yrs72.9
BELLAIRESubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs72.9
ADDICKSSubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs72.7
T H WhartonBrownfieldTXHarris248 MW71.2
O'BRIENSubstation-AdjacentTXFort Bend County345 kV600 MW3.4 yrs71.2
ZENITHSubstation-AdjacentTXWaller County345 kV600 MW3.4 yrs70.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for READING substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.