PECAN CREEK
SubstationTexas
PECAN CREEK is an electric transmission substation in Texas. It is classified as high-voltage (345 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #6838 | 345 kV | — | IN SERVICE | 23.6 mi |
| #28922 | 345 kV | — | IN SERVICE | 16.0 mi |
| #48238 | 345 kV | — | IN SERVICE | 36.0 mi |
| #13269 | 161 kV | — | IN SERVICE | 7.2 mi |
| #13272 | 161 kV | — | IN SERVICE | 34.9 mi |
| #41694 | 161 kV | — | IN SERVICE | 4.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of PECAN CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| GREEN COUNTRY | Substation-Adjacent | OK | Tulsa County | 345 kV | 600 MW | 3.4 yrs | 77.0 |
| PECAN CREEK | Substation-Adjacent | OK | Muskogee County | 345 kV | 600 MW | 3.4 yrs | 72.7 |
| TAP148807 | Substation-Adjacent | OK | McIntosh County | 345 kV | 600 MW | 3.4 yrs | 72.6 |
| TAP148909 | Substation-Adjacent | OK | Tulsa County | 138 kV | 100 MW | 3.4 yrs | 71.9 |
| TAP168566 | Substation-Adjacent | OK | Tulsa County | 138 kV | 100 MW | 3.4 yrs | 71.7 |
| UNKNOWN119536 | Substation-Adjacent | OK | Tulsa County | 138 kV | 100 MW | 3.4 yrs | 71.7 |
| TAP148881 | Substation-Adjacent | OK | Tulsa County | 138 kV | 100 MW | 3.4 yrs | 71.5 |
| ONETA | Substation-Adjacent | OK | Wagoner County | 345 kV | 600 MW | 3.4 yrs | 71.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.