PATTERN GULF WIND

Substation

Texas · AEP TEXAS CENTRAL CO.

Max voltage
138
kV

PATTERN GULF WIND is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL CO.. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorAEP TEXAS CENTRAL CO.
StateTexas
Coordinates27.0013, -97.5994

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#92622138 kVAEP TEXAS CENTRAL CO.1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PATTERN GULF WIND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PATTERN GULF WIND substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN309711Substation-AdjacentTXKenedy County345 kV600 MW3.4 yrs67.9
Greenfield (UNKNOWN300348 - UNKNOWN309711)GreenfieldTXKleberg County345 kV600 MW3.4 yrs64.4
Greenfield (UNKNOWN300348 - UNKNOWN309711)GreenfieldTXKleberg County345 kV600 MW3.4 yrs64.4
UNKNOWN310435Substation-AdjacentTXWillacy County138 kV100 MW3.4 yrs63.8
Greenfield (UNKNOWN300348 - UNKNOWN309711)GreenfieldTXKleberg County345 kV600 MW3.4 yrs62.8
Greenfield (RIO HONDO - UNKNOWN309711)GreenfieldTXKenedy County345 kV600 MW3.4 yrs61.5
Greenfield (UNKNOWN308606 - NORTH EDINBURG)GreenfieldTXKleberg County345 kV600 MW3.4 yrs61.3
Greenfield (UNKNOWN308606 - NORTH EDINBURG)GreenfieldTXBrooks County345 kV600 MW3.4 yrs60.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PATTERN GULF WIND substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.