PARISH

Substation

Texas · CENTERPOINT ENERGY

Max voltage
345
kV

PARISH is an electric transmission substation in Texas, operated by CENTERPOINT ENERGY. It is classified as high-voltage (345 kv) and connects 14 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines14

Ownership & operation

OperatorCENTERPOINT ENERGY
Co-ownerCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
StateTexas
Coordinates29.4807, -95.6241

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#92734345 kVCENTERPOINT ENERGYIN SERVICE49.0 mi
#83065345 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE25.0 mi
#83149345 kVCENTERPOINT ENERGYIN SERVICE49.0 mi
#83701345 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE0.6 mi
#84102345 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE19.7 mi
#84428345 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE19.7 mi
#82172345 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE20.2 mi
#85374345 kVCENTERPOINT ENERGYIN SERVICE68.5 mi
#86172345 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE0.5 mi
#87904345 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE17.1 mi
#91006345 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE17.1 mi
#91610345 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PARISH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PARISH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DEEPWATERSubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs73.7
WHITE OAKSubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs73.6
JEANETTASubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs73.0
BELLAIRESubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs72.9
ADDICKSSubstation-AdjacentTXHarris County345 kV600 MW3.4 yrs72.7
O'BRIENSubstation-AdjacentTXFort Bend County345 kV600 MW3.4 yrs71.2
DOWNTOWNSubstation-AdjacentTXHarris County138 kV100 MW3.4 yrs69.4
PARISHSubstation-AdjacentTXFort Bend County345 kV600 MW3.4 yrs69.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PARISH substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.