ORSTED

Substation

Texas · PEDERNALES ELECTRIC COOP, INC

Max voltage
345
kV

ORSTED is an electric transmission substation in Texas, operated by PEDERNALES ELECTRIC COOP, INC. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorPEDERNALES ELECTRIC COOP, INC
StateTexas
Coordinates30.6959, -100.1949

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85288345 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE52.8 mi
#86629345 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE34.9 mi
#90424345 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE34.9 mi
#91517345 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE52.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ORSTED, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ORSTED substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BIG HILLSubstation-AdjacentTXSchleicher County345 kV600 MW3.4 yrs65.3
ORSTEDSubstation-AdjacentTXSutton County345 kV600 MW3.4 yrs60.3
UNKNOWN303139Substation-AdjacentTXSchleicher County138 kV100 MW3.4 yrs59.6
Greenfield (BIG HILL - ORSTED)GreenfieldTXSchleicher County345 kV600 MW3.4 yrs58.6
TAP310886Substation-AdjacentTXSchleicher County138 kV100 MW3.4 yrs57.4
Greenfield (ORSTED - BIG HILL)GreenfieldTXSchleicher County345 kV600 MW3.4 yrs57.1
Greenfield (ORSTED - EDISON)GreenfieldTXKimble County345 kV600 MW3.4 yrs56.9
Greenfield (BIG HILL - ORSTED)GreenfieldTXSchleicher County345 kV600 MW3.4 yrs56.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ORSTED substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.