ORO GRANDE

Substation

Texas · EL PASO ELECTRIC POWER COMPANY

Max voltage
115
kV

ORO GRANDE is an electric transmission substation in Texas, operated by EL PASO ELECTRIC POWER COMPANY. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership & operation

OperatorEL PASO ELECTRIC POWER COMPANY
StateTexas
Coordinates32.4056, -106.1418

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82435115 kV3.5 mi
#83088115 kVEL PASO ELECTRIC POWER COMPANY15.0 mi
#85801115 kVEL PASO ELECTRIC POWER COMPANY9.7 mi
#89767115 kVEL PASO ELECTRIC POWER COMPANY0.1 mi
#89918115 kV35.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ORO GRANDE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ORO GRANDE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AMRADSubstation-AdjacentNMOtero County345 kV600 MW3.4 yrs69.4
Greenfield (ARROYO - NEWMAN)GreenfieldTXEl Paso County345 kV600 MW3.4 yrs63.6
Greenfield (CALIENTE - AMRAD)GreenfieldTXEl Paso County345 kV600 MW3.4 yrs62.5
Greenfield (CALIENTE - AMRAD)GreenfieldTXEl Paso County345 kV600 MW3.4 yrs62.5
Greenfield (CALIENTE - AMRAD)GreenfieldTXEl Paso County345 kV600 MW3.4 yrs62.4
RED EYESubstation-AdjacentNMOtero County115 kV100 MW3.4 yrs61.8
Greenfield (AMRAD - EDDY AC-DC-AC TIE)GreenfieldNMOtero County345 kV600 MW3.4 yrs61.4
Greenfield (CALIENTE - AMRAD)GreenfieldTXEl Paso County345 kV600 MW3.4 yrs61.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen