OJO

Substation

Texas · JEMEZ MOUNTAIN ELECTRIC COOPERATIVE

Max voltage
345
kV

OJO is an electric transmission substation in Texas, operated by JEMEZ MOUNTAIN ELECTRIC COOPERATIVE. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage115 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorJEMEZ MOUNTAIN ELECTRIC COOPERATIVE
StateTexas
Coordinates36.1121, -106.1593

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81365345 kVIN SERVICE37.5 mi
#83690345 kVIN SERVICE154.1 mi
#92669115 kVJEMEZ MOUNTAIN ELECTRIC COOPERATIVEIN SERVICE5.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of OJO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near OJO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (OJO - TAOS)GreenfieldNMTaos County345 kV600 MW3.4 yrs64.4
OJOSubstation-AdjacentNMLos Alamos County345 kV600 MW3.4 yrs62.2
Greenfield (OJO - TAOS)GreenfieldNMTaos County345 kV600 MW3.4 yrs61.8
TAP318061Substation-AdjacentNMTaos County115 kV100 MW3.4 yrs60.2
TA53Substation-AdjacentNMLos Alamos County115 kV100 MW3.4 yrs59.4
Greenfield (OJO - TAOS)GreenfieldNMLos Alamos County345 kV600 MW3.4 yrs58.5
ETASubstation-AdjacentNMLos Alamos County115 kV100 MW3.4 yrs58.4
WTASubstation-AdjacentNMLos Alamos County115 kV100 MW3.4 yrs58.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OJO substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.