OGALLALA

Substation

Texas · DEAF SMITH ELECTRIC COOP, INC

Max voltage
345
kV

OGALLALA is an electric transmission substation in Texas, operated by DEAF SMITH ELECTRIC COOP, INC. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorDEAF SMITH ELECTRIC COOP, INC
Co-ownerSOUTHWESTERN PUBLIC SERVICE CO
StateTexas
Coordinates34.5196, -102.0387

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81405345 kVDEAF SMITH ELECTRIC COOP, INCIN SERVICE26.7 mi
#86276345 kVSOUTHWESTERN PUBLIC SERVICE COIN SERVICE46.7 mi
#87710345 kVSOUTHWESTERN PUBLIC SERVICE COIN SERVICE46.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of OGALLALA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near OGALLALA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OGALLALASubstation-AdjacentTXCastro County345 kV600 MW3.4 yrs70.9
WINDMILLSubstation-AdjacentTXCastro County345 kV600 MW3.4 yrs70.4
SWISHERSubstation-AdjacentTXSwisher County230 kV300 MW3.4 yrs69.2
PLANT XSubstation-AdjacentTXLamb County230 kV300 MW3.4 yrs69.1
Plant XBrownfieldTXLamb244 MW68.0
UNKNOWN308766Substation-AdjacentTXCastro County138 kV100 MW3.4 yrs65.5
Greenfield (TULE CANYON - OGALLALA)GreenfieldTXSwisher County345 kV600 MW3.4 yrs65.0
UNKNOWN303240Substation-AdjacentTXSwisher County115 kV100 MW3.4 yrs64.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OGALLALA substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.