NORTH ALAMO

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
138
kV

NORTH ALAMO is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates26.2310, -98.1134

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83014138 kVAEP TEXAS CENTRAL COMPANY3.8 mi
#84585138 kVAEP TEXAS CENTRAL COMPANY6.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NORTH ALAMO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NORTH ALAMO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH EDINBURGSubstation-AdjacentTXHidalgo County345 kV600 MW3.4 yrs73.5
POMELOSubstation-AdjacentTXHidalgo County345 kV600 MW3.4 yrs70.7
UNKNOWN309640Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.9
SOUIXSubstation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.7
UNKNOWN301271Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.7
WEST MCALLENSubstation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.7
UNKNOWN306206Substation-AdjacentTXCameron County138 kV100 MW3.4 yrs69.6
UNKNOWN304555Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORTH ALAMO substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.