NEWTON BULK

Substation

Texas · DEEP EAST TEXAS ELEC COOP INC

Max voltage
138
kV

NEWTON BULK is an electric transmission substation in Texas, operated by DEEP EAST TEXAS ELEC COOP INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorDEEP EAST TEXAS ELEC COOP INC
StateTexas
Coordinates30.8699, -93.7877

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#80021138 kVDEEP EAST TEXAS ELEC COOP INCIN SERVICE25.1 mi
#83996138 kVDEEP EAST TEXAS ELEC COOP INCIN SERVICE14.6 mi
#87234138 kVDEEP EAST TEXAS ELEC COOP INC9.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEWTON BULK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEWTON BULK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LEACHSubstation-AdjacentTXSabine County500 kV1,000 MW3.4 yrs67.8
UNKNOWN303664Substation-AdjacentTXSabine County138 kV100 MW3.4 yrs63.2
SAM DAMSubstation-AdjacentTXJasper County138 kV100 MW3.4 yrs63.2
Greenfield (HARTBURG - LEACH)GreenfieldTXNewton County500 kV1,000 MW3.4 yrs62.8
UNKNOWN302189Substation-AdjacentTXSabine County138 kV100 MW3.4 yrs62.4
UNKNOWN305966Substation-AdjacentTXTyler County138 kV100 MW3.4 yrs62.3
Greenfield (HARTBURG - LEACH)GreenfieldTXNewton County500 kV1,000 MW3.4 yrs62.2
UNKNOWN307120Substation-AdjacentTXJasper County138 kV100 MW3.4 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NEWTON BULK substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.