NEW GULF

Substation

Texas · CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC

Max voltage
138
kV

NEW GULF is an electric transmission substation in Texas, operated by CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
StateTexas
Coordinates29.2302, -95.9193

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#86157138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE3.8 mi
#92304138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCIN SERVICE6.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEW GULF, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEW GULF substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PARISHSubstation-AdjacentTXFort Bend County345 kV600 MW3.4 yrs69.3
Greenfield (O'BRIEN - PARISH)GreenfieldTXFort Bend County345 kV600 MW3.4 yrs67.1
QUAIL VALLEYSubstation-AdjacentTXFort Bend County138 kV100 MW3.4 yrs66.7
IMPERIALSubstation-AdjacentTXFort Bend County138 kV100 MW3.4 yrs65.6
MISSOURI CITYSubstation-AdjacentTXFort Bend County138 kV100 MW3.4 yrs65.2
BLESSINGSubstation-AdjacentTXMatagorda County345 kV600 MW3.4 yrs65.0
SIENNASubstation-AdjacentTXFort Bend County138 kV100 MW3.4 yrs64.8
TAP307887Substation-AdjacentTXFort Bend County138 kV100 MW3.4 yrs64.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen