NEF
SubstationTexas · SOUTHWEST PUBLIC SERVICE COMPANY
NEF is an electric transmission substation in Texas, operated by SOUTHWEST PUBLIC SERVICE COMPANY. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #80218 | 115 kV | SOUTHWEST PUBLIC SERVICE COMPANY | IN SERVICE | 7.4 mi |
| #80219 | 115 kV | SOUTHWEST PUBLIC SERVICE COMPANY | IN SERVICE | 8.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of NEF, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CUNNINGHAM | Substation-Adjacent | NM | Lea County | 230 kV | 300 MW | 3.4 yrs | 67.9 |
| UNKNOWN302202 | Substation-Adjacent | NM | Lea County | 230 kV | 300 MW | 3.4 yrs | 65.9 |
| UNKNOWN308190 | Substation-Adjacent | NM | Lea County | 115 kV | 100 MW | 3.4 yrs | 64.1 |
| MADDOX | Substation-Adjacent | NM | Lea County | 115 kV | 100 MW | 3.4 yrs | 63.3 |
| LEA ROAD | Substation-Adjacent | NM | Lea County | 115 kV | 100 MW | 3.4 yrs | 63.3 |
| NEF | Substation-Adjacent | NM | Lea County | 115 kV | 100 MW | 3.4 yrs | 62.9 |
| NE-HOBBS | Substation-Adjacent | NM | Lea County | 115 kV | 100 MW | 3.4 yrs | 62.8 |
| UNKNOWN305653 | Substation-Adjacent | NM | Lea County | 115 kV | 100 MW | 3.4 yrs | 62.8 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for NEF substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.