MOUNTAIN TOP
SubstationTexas · CENTRAL TEXAS ELEC COOP, INC
MOUNTAIN TOP is an electric transmission substation in Texas, operated by CENTRAL TEXAS ELEC COOP, INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #85070 | 138 kV | PEDERNALES ELECTRIC COOP, INC | IN SERVICE | 4.8 mi |
| #85173 | 138 kV | CENTRAL TEXAS ELEC COOP, INC | IN SERVICE | 35.3 mi |
| #87660 | 138 kV | CENTRAL TEXAS ELEC COOP, INC | — | 11.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of MOUNTAIN TOP, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| FISCHER | Substation-Adjacent | TX | Comal County | 138 kV | 100 MW | 3.4 yrs | 65.0 |
| TRADING POST | Substation-Adjacent | TX | Travis County | 138 kV | 100 MW | 3.4 yrs | 64.7 |
| SATTLER | Substation-Adjacent | TX | Comal County | 138 kV | 100 MW | 3.4 yrs | 64.5 |
| RUTHERFORD | Substation-Adjacent | TX | Hays County | 138 kV | 100 MW | 3.4 yrs | 64.3 |
| UNKNOWN305635 | Substation-Adjacent | TX | Hays County | 138 kV | 100 MW | 3.4 yrs | 63.8 |
| CANYON DAM | Substation-Adjacent | TX | Comal County | 138 kV | 100 MW | 3.4 yrs | 63.6 |
| UNKNOWN303070 | Substation-Adjacent | TX | Hays County | 138 kV | 100 MW | 3.4 yrs | 63.5 |
| LAKEWAY | Substation-Adjacent | TX | Hays County | 138 kV | 100 MW | 3.4 yrs | 63.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.