MORIARITY
SubstationTexas · CENTRAL NEW MEXICO ELECTRIC COOPERATIVE
MORIARITY is an electric transmission substation in Texas, operated by CENTRAL NEW MEXICO ELECTRIC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #80632 | 115 kV | — | IN SERVICE | 39.8 mi |
| #82290 | 115 kV | CENTRAL NEW MEXICO ELECTRIC COOPERATIVE | IN SERVICE | 27.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of MORIARITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ALGODONES | Substation-Adjacent | NM | Bernalillo County | 230 kV | 300 MW | 3.4 yrs | 67.7 |
| B-A | Substation-Adjacent | NM | Bernalillo County | 345 kV | 600 MW | 3.4 yrs | 67.4 |
| CUCHILLA | Substation-Adjacent | NM | Bernalillo County | 230 kV | 300 MW | 3.4 yrs | 67.2 |
| CUCHILLA TAP (RS LINE) | Substation-Adjacent | NM | Santa Fe County | 230 kV | 300 MW | 3.4 yrs | 66.6 |
| WILLARD | Substation-Adjacent | NM | Torrance County | 230 kV | 300 MW | 3.4 yrs | 64.8 |
| LAWRENCE TAP | Substation-Adjacent | NM | Bernalillo County | 115 kV | 100 MW | 3.4 yrs | 64.0 |
| Greenfield (NORTON - B-A) | Greenfield | NM | Santa Fe County | 345 kV | 600 MW | 3.4 yrs | 62.9 |
| Greenfield (B-A - GUADALUPE) | Greenfield | NM | Santa Fe County | 345 kV | 600 MW | 3.4 yrs | 61.6 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for MORIARITY substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.