MORIARITY

Substation

Texas · CENTRAL NEW MEXICO ELECTRIC COOPERATIVE

Max voltage
115
kV

MORIARITY is an electric transmission substation in Texas, operated by CENTRAL NEW MEXICO ELECTRIC COOPERATIVE. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorCENTRAL NEW MEXICO ELECTRIC COOPERATIVE
StateTexas
Coordinates35.0110, -106.0871

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#80632115 kVIN SERVICE39.8 mi
#82290115 kVCENTRAL NEW MEXICO ELECTRIC COOPERATIVEIN SERVICE27.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MORIARITY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MORIARITY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ALGODONESSubstation-AdjacentNMBernalillo County230 kV300 MW3.4 yrs67.7
B-ASubstation-AdjacentNMBernalillo County345 kV600 MW3.4 yrs67.4
CUCHILLASubstation-AdjacentNMBernalillo County230 kV300 MW3.4 yrs67.2
CUCHILLA TAP (RS LINE)Substation-AdjacentNMSanta Fe County230 kV300 MW3.4 yrs66.6
WILLARDSubstation-AdjacentNMTorrance County230 kV300 MW3.4 yrs64.8
LAWRENCE TAPSubstation-AdjacentNMBernalillo County115 kV100 MW3.4 yrs64.0
Greenfield (NORTON - B-A)GreenfieldNMSanta Fe County345 kV600 MW3.4 yrs62.9
Greenfield (B-A - GUADALUPE)GreenfieldNMSanta Fe County345 kV600 MW3.4 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.