MOORE
SubstationTexas · AEP TEXAS CENTRAL COMPANY
MOORE is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #86444 | 345 kV | AEP TEXAS CENTRAL COMPANY | IN SERVICE | 6.1 mi |
| #89041 | 345 kV | AEP TEXAS CENTRAL COMPANY | IN SERVICE | 40.6 mi |
| #82044 | 138 kV | AEP TEXAS CENTRAL COMPANY | — | 7.7 mi |
| #88568 | 138 kV | AEP TEXAS CENTRAL COMPANY | — | 11.2 mi |
| #89889 | 138 kV | AEP TEXAS CENTRAL COMPANY | IN SERVICE | 14.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of MOORE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CAGNON ROAD | Substation-Adjacent | TX | Bexar County | 345 kV | 600 MW | 3.4 yrs | 74.8 |
| TEXAS RESEARCH | Substation-Adjacent | TX | Bexar County | 138 kV | 100 MW | 3.4 yrs | 68.6 |
| CASTROVILLE | Substation-Adjacent | TX | Medina County | 138 kV | 100 MW | 3.4 yrs | 68.1 |
| LYTLE | Substation-Adjacent | TX | Medina County | 138 kV | 100 MW | 3.4 yrs | 67.2 |
| VLSI | Substation-Adjacent | TX | Bexar County | 138 kV | 100 MW | 3.4 yrs | 67.0 |
| MARBACH ROAD | Substation-Adjacent | TX | Bexar County | 138 kV | 100 MW | 3.4 yrs | 66.8 |
| TAP307847 | Substation-Adjacent | TX | Medina County | 138 kV | 100 MW | 3.4 yrs | 66.3 |
| MOORE | Substation-Adjacent | TX | Frio County | 345 kV | 600 MW | 3.4 yrs | 66.2 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.