MONTICELLO

Substation

Texas · BOWIE-CASS ELECTRIC COOP, INC

Max voltage
345
kV

MONTICELLO is an electric transmission substation in Texas, operated by BOWIE-CASS ELECTRIC COOP, INC. It is classified as high-voltage (345 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines1

Ownership & operation

OperatorBOWIE-CASS ELECTRIC COOP, INC
StateTexas
Coordinates33.0911, -95.0383

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#79918345 kVBOWIE-CASS ELECTRIC COOP, INCIN SERVICE0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MONTICELLO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MONTICELLO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN310398Substation-AdjacentTXCamp County345 kV600 MW3.4 yrs71.1
DIANASubstation-AdjacentTXUpshur County345 kV600 MW3.4 yrs70.9
UNKNOWN309146Substation-AdjacentTXMorris County345 kV600 MW3.4 yrs70.5
UNKNOWN306638Substation-AdjacentTXCamp County345 kV600 MW3.4 yrs69.8
UNKNOWN312589Substation-AdjacentTXMorris County345 kV600 MW3.4 yrs65.8
Greenfield (SULPHUR SPRINGS SWITCHING - UN)GreenfieldTXFranklin County345 kV600 MW3.4 yrs64.5
UNKNOWN304475Substation-AdjacentTXWood County138 kV100 MW3.4 yrs64.0
Greenfield (UNKNOWN307466 - UNKNOWN306638)GreenfieldTXCamp County345 kV600 MW3.4 yrs63.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MONTICELLO substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.