MILLER CREEK

Substation

Texas · PEDERNALES ELECTRIC COOP, INC

Max voltage
138
kV

MILLER CREEK is an electric transmission substation in Texas, operated by PEDERNALES ELECTRIC COOP, INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorPEDERNALES ELECTRIC COOP, INC
StateTexas
Coordinates30.2620, -98.2984

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82079138 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE9.5 mi
#85070138 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE4.8 mi
#91448138 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE3.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MILLER CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MILLER CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FRIENDSHIPSubstation-AdjacentTXHays County138 kV100 MW3.4 yrs66.4
NAMELESSSubstation-AdjacentTXWilliamson County138 kV100 MW3.4 yrs65.5
MARSHALL FORDSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs65.4
FISCHERSubstation-AdjacentTXComal County138 kV100 MW3.4 yrs65.0
TRADING POSTSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs64.7
RUTHERFORDSubstation-AdjacentTXHays County138 kV100 MW3.4 yrs64.3
UNKNOWN305635Substation-AdjacentTXHays County138 kV100 MW3.4 yrs63.8
HILLTOPSubstation-AdjacentTXHays County138 kV100 MW3.4 yrs63.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MILLER CREEK substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.