MIGUEL LUJAN TAP (NS LINE)
SubstationTexas · PUBLIC SERVICE COMPANY OF NEW MEXICO
MIGUEL LUJAN TAP (NS LINE) is an electric transmission substation in Texas, operated by PUBLIC SERVICE COMPANY OF NEW MEXICO. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #82429 | 115 kV | PUBLIC SERVICE COMPANY OF NEW MEXICO | IN SERVICE | 1.8 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of MIGUEL LUJAN TAP (NS LINE), ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CUCHILLA | Substation-Adjacent | NM | Bernalillo County | 230 kV | 300 MW | 3.4 yrs | 67.2 |
| MIGUEL LUJAN | Substation-Adjacent | NM | Santa Fe County | 230 kV | 300 MW | 3.4 yrs | 67.1 |
| CUCHILLA TAP (RS LINE) | Substation-Adjacent | NM | Santa Fe County | 230 kV | 300 MW | 3.4 yrs | 66.6 |
| MIGUEL LUJAN TAP (NS LINE) | Substation-Adjacent | NM | Santa Fe County | 115 kV | 100 MW | 3.4 yrs | 64.0 |
| MEJIA | Substation-Adjacent | NM | Santa Fe County | 115 kV | 100 MW | 3.4 yrs | 63.9 |
| Greenfield (NORTON - B-A) | Greenfield | NM | Santa Fe County | 345 kV | 600 MW | 3.4 yrs | 63.4 |
| SOUTH PACHECO | Substation-Adjacent | NM | Santa Fe County | 115 kV | 100 MW | 3.4 yrs | 63.3 |
| Greenfield (NORTON - B-A) | Greenfield | NM | Santa Fe County | 345 kV | 600 MW | 3.4 yrs | 62.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for MIGUEL LUJAN TAP (NS LINE) substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.