MIGUEL LUJAN

Substation

Texas · PUBLIC SERVICE COMPANY OF NEW MEXICO

Max voltage
230
kV

MIGUEL LUJAN is an electric transmission substation in Texas, operated by PUBLIC SERVICE COMPANY OF NEW MEXICO. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorPUBLIC SERVICE COMPANY OF NEW MEXICO
StateTexas
Coordinates35.6630, -105.9907

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#91788230 kVPUBLIC SERVICE COMPANY OF NEW MEXICOIN SERVICE3.7 mi
#82429115 kVPUBLIC SERVICE COMPANY OF NEW MEXICOIN SERVICE1.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MIGUEL LUJAN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MIGUEL LUJAN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MIGUEL LUJANSubstation-AdjacentNMSanta Fe County230 kV300 MW3.4 yrs67.1
CUCHILLA TAP (RS LINE)Substation-AdjacentNMSanta Fe County230 kV300 MW3.4 yrs66.6
MIGUEL LUJAN TAP (NS LINE)Substation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs64.0
MEJIASubstation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs63.9
Greenfield (NORTON - B-A)GreenfieldNMSanta Fe County345 kV600 MW3.4 yrs63.4
SOUTH PACHECOSubstation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs63.3
Greenfield (NORTON - B-A)GreenfieldNMSanta Fe County345 kV600 MW3.4 yrs62.9
ELDORADOSubstation-AdjacentNMSanta Fe County115 kV100 MW3.4 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MIGUEL LUJAN substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.