MARTIN LAKES

Substation

Texas · CHEROKEE COUNTY ELEC COOP ASSN

Max voltage
345
kV

MARTIN LAKES is an electric transmission substation in Texas, operated by CHEROKEE COUNTY ELEC COOP ASSN. It is classified as high-voltage (345 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines5

Ownership & operation

OperatorCHEROKEE COUNTY ELEC COOP ASSN
Co-ownerUPSHUR RURAL ELEC COOP CORP
StateTexas
Coordinates32.2575, -94.5749

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#82154345 kVCHEROKEE COUNTY ELEC COOP ASSNIN SERVICE40.8 mi
#83407345 kVUPSHUR RURAL ELEC COOP CORPIN SERVICE42.6 mi
#85390345 kVUPSHUR RURAL ELEC COOP CORPIN SERVICE42.6 mi
#89312345 kVUPSHUR RURAL ELEC COOP CORP43.5 mi
#79901138 kVIN SERVICE1.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MARTIN LAKES, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MARTIN LAKES substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MARTIN LAKESSubstation-AdjacentTXRusk County345 kV600 MW3.4 yrs72.8
UNKNOWN308218Substation-AdjacentTXRusk County345 kV600 MW3.4 yrs70.2
UNKNOWN304391Substation-AdjacentTXRusk County345 kV600 MW3.4 yrs69.8
UNKNOWN304659Substation-AdjacentTXGregg County345 kV600 MW3.4 yrs69.0
PirkeyBrownfieldTXHarrison721 MW68.4
STRYKER CREEKSubstation-AdjacentTXCherokee County345 kV600 MW3.4 yrs67.8
UNKNOWN309941Substation-AdjacentTXHarrison County345 kV600 MW3.4 yrs67.6
UNKNOWN300974Substation-AdjacentTXHarrison County345 kV600 MW3.4 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen