MAJESTIC 1 WIND FARM

Substation

Texas · SOUTHWESTERN PUBLIC SERVICE CO.

Max voltage
230
kV

MAJESTIC 1 WIND FARM is an electric transmission substation in Texas, operated by SOUTHWESTERN PUBLIC SERVICE CO.. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorSOUTHWESTERN PUBLIC SERVICE CO.
StateTexas
Coordinates35.3765, -101.5397

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#81369230 kVSOUTHWESTERN PUBLIC SERVICE CO.0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MAJESTIC 1 WIND FARM, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MAJESTIC 1 WIND FARM substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
POTTER COUNTYSubstation-AdjacentTXPotter County345 kV600 MW3.4 yrs74.3
HARRINGTONSubstation-AdjacentTXPotter County230 kV300 MW3.4 yrs72.9
AMARILLO SOUTHSubstation-AdjacentTXRandall County230 kV300 MW3.4 yrs72.6
TAP302718Substation-AdjacentTXPotter County230 kV300 MW3.4 yrs72.2
ROLLING HILLSSubstation-AdjacentTXPotter County230 kV300 MW3.4 yrs70.0
ALIBATESSubstation-AdjacentTXCarson County345 kV600 MW3.4 yrs69.7
TAP305362Substation-AdjacentTXPotter County115 kV100 MW3.4 yrs69.2
RAILHEADSubstation-AdjacentTXCarson County345 kV600 MW3.4 yrs69.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.