LOLITA

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
138
kV

LOLITA is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as sub-transmission (138 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines5

Ownership & operation

OperatorAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates28.8532, -96.5574

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83031138 kVAEP TEXAS CENTRAL COMPANY6.5 mi
#85373138 kVIN SERVICE42.0 mi
#88589138 kVAEP TEXAS CENTRAL COMPANY22.4 mi
#90973138 kVAEP TEXAS CENTRAL COMPANYIN SERVICE28.7 mi
#91999138 kVAEP TEXAS CENTRAL COMPANYIN SERVICE11.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LOLITA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LOLITA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN302809Substation-AdjacentTXVictoria County345 kV600 MW3.4 yrs68.5
BLESSINGSubstation-AdjacentTXMatagorda County345 kV600 MW3.4 yrs65.0
UNKNOWN309487Substation-AdjacentTXVictoria County138 kV100 MW3.4 yrs64.1
UNKNOWN305897Substation-AdjacentTXCalhoun County138 kV100 MW3.4 yrs64.0
UNKNOWN307002Substation-AdjacentTXCalhoun County138 kV100 MW3.4 yrs63.9
UNKNOWN309946Substation-AdjacentTXJackson County138 kV100 MW3.4 yrs63.8
UNKNOWN301241Substation-AdjacentTXCalhoun County138 kV100 MW3.4 yrs63.5
UNKNOWN309994Substation-AdjacentTXCalhoun County138 kV100 MW3.4 yrs63.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LOLITA substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.