LAKE JACKSON

Substation

Texas · CENTERPOINT ENERGY

Max voltage
138
kV

LAKE JACKSON is an electric transmission substation in Texas, operated by CENTERPOINT ENERGY. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorCENTERPOINT ENERGY
Co-ownerCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC
StateTexas
Coordinates29.0527, -95.4240

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85317138 kVCENTERPOINT ENERGY HOUSTON ELECTRIC, LLC4.8 mi
#86286138 kVCENTERPOINT ENERGYIN SERVICE17.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LAKE JACKSON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LAKE JACKSON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DOW VELASCOSubstation-AdjacentTXBrazoria County345 kV600 MW3.4 yrs69.5
TAP310677Substation-AdjacentTXGalveston County345 kV600 MW3.4 yrs68.2
UNKNOWN302859Substation-AdjacentTXBrazoria County138 kV100 MW3.4 yrs64.8
UNKNOWN310390Substation-AdjacentTXBrazoria County138 kV100 MW3.4 yrs64.1
BIPORTSubstation-AdjacentTXBrazoria County138 kV100 MW3.4 yrs63.2
Greenfield (DOW VELASCO - OASIS)GreenfieldTXBrazoria County345 kV600 MW3.4 yrs63.1
HOFMANSubstation-AdjacentTXBrazoria County138 kV100 MW3.4 yrs63.1
MUSTANG BAYOUSubstation-AdjacentTXBrazoria County138 kV100 MW3.4 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for LAKE JACKSON substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.