KENEDY

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
345
kV

KENEDY is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as high-voltage (345 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines2

Ownership & operation

OperatorAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates28.8418, -97.8379

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87909345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE45.2 mi
#90013345 kVAEP TEXAS CENTRAL COMPANYIN SERVICE7.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of KENEDY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near KENEDY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN309262Substation-AdjacentTXKarnes County345 kV600 MW3.4 yrs67.7
HELENASubstation-AdjacentTXKarnes County345 kV600 MW3.4 yrs67.5
KENEDYSubstation-AdjacentTXKarnes County345 kV600 MW3.4 yrs65.7
UNKNOWN301065Substation-AdjacentTXKarnes County345 kV600 MW3.4 yrs64.7
STOCKDALESubstation-AdjacentTXWilson County138 kV100 MW3.4 yrs64.4
FALLS CITYSubstation-AdjacentTXKarnes County138 kV100 MW3.4 yrs63.5
Greenfield (ELM CREEK - SAN MIGUEL)GreenfieldTXWilson County345 kV600 MW3.4 yrs63.5
FLORESVILLESubstation-AdjacentTXWilson County138 kV100 MW3.4 yrs63.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.