JACKIE HOWARD

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
345
kV

JACKIE HOWARD is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as high-voltage (345 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines1

Ownership & operation

OperatorAEP TEXAS CENTRAL COMPANY
StateTexas
Coordinates26.5649, -98.6984

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#92327345 kVAEP TEXAS CENTRAL COMPANY10.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JACKIE HOWARD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JACKIE HOWARD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
POMELOSubstation-AdjacentTXHidalgo County345 kV600 MW3.4 yrs70.7
UNKNOWN301271Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs69.7
DEL SOLSubstation-AdjacentTXStarr County345 kV600 MW3.4 yrs68.9
MIGHOWARDSubstation-AdjacentTXStarr County345 kV600 MW3.4 yrs68.8
UNKNOWN302209Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs68.8
UNKNOWN302118Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs68.7
SOUTH MISSIONSubstation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs68.6
UNKNOWN304734Substation-AdjacentTXHidalgo County138 kV100 MW3.4 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JACKIE HOWARD substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.