JACK CREEK

Substation

Texas · CITY OF BRYAN - (TX)

Max voltage
345
kV

JACK CREEK is an electric transmission substation in Texas, operated by CITY OF BRYAN - (TX). It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorCITY OF BRYAN - (TX)
Co-ownerMID-SOUTH ELECTRIC COOP ASSN
StateTexas
Coordinates30.8590, -96.2590

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84709345 kVCITY OF BRYAN - (TX)IN SERVICE26.4 mi
#89570345 kVMID-SOUTH ELECTRIC COOP ASSNIN SERVICE21.8 mi
#84746138 kV6.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of JACK CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near JACK CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JACK CREEKSubstation-AdjacentTXBrazos County345 kV600 MW3.4 yrs72.6
SINGLETONSubstation-AdjacentTXGrimes County345 kV600 MW3.4 yrs71.9
FAYETTEVILLESubstation-AdjacentTXBrazos County345 kV600 MW3.4 yrs71.8
TWIN OAKSubstation-AdjacentTXRobertson County345 kV600 MW3.4 yrs70.7
GIBBONS CREEKSubstation-AdjacentTXGrimes County345 kV600 MW3.4 yrs69.4
UNKNOWN312648Substation-AdjacentTXBrazos County138 kV100 MW3.4 yrs69.2
TAP312651Substation-AdjacentTXBrazos County138 kV100 MW3.4 yrs69.1
GRIMESSubstation-AdjacentTXGrimes County345 kV600 MW3.4 yrs68.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen