IGO

Substation

Texas · OKLAHOMA GAS & ELECTRIC CO

Max voltage
161
kV

IGO is an electric transmission substation in Texas, operated by OKLAHOMA GAS & ELECTRIC CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorOKLAHOMA GAS & ELECTRIC CO
StateTexas
Coordinates35.4303, -93.5750

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#14160161 kVOKLAHOMA GAS & ELECTRIC COIN SERVICE9.7 mi
#14161161 kVOKLAHOMA GAS & ELECTRIC COIN SERVICE7.0 mi
#14162161 kVOKLAHOMA GAS & ELECTRIC COIN SERVICE10.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of IGO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near IGO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ARKANSAS NUCLEAR ONESubstation-AdjacentARPope County500 kV1,000 MW3.4 yrs73.6
Greenfield (FORT SMITH - ARKANSAS NUCLEAR )GreenfieldARYell County500 kV1,000 MW3.4 yrs67.3
UNKNOWN108021Substation-AdjacentARFranklin County161 kV100 MW3.4 yrs67.1
UNKNOWN117222Substation-AdjacentARFranklin County161 kV100 MW3.4 yrs67.1
THOMAS FITZHUGHSubstation-AdjacentARFranklin County161 kV100 MW3.4 yrs66.6
TAP154813Substation-AdjacentARFranklin County161 kV100 MW3.4 yrs66.4
Greenfield (FORT SMITH - ARKANSAS NUCLEAR )GreenfieldARYell County500 kV1,000 MW3.4 yrs66.3
Greenfield (FORT SMITH - ARKANSAS NUCLEAR )GreenfieldARYell County500 kV1,000 MW3.4 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for IGO substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.