HOWARD
SubstationTexas · BANDERA ELECTRIC COOP, INC
HOWARD is an electric transmission substation in Texas, operated by BANDERA ELECTRIC COOP, INC. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #83912 | 138 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 2.4 mi |
| #87407 | 138 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 7.6 mi |
| #92433 | 138 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 5.0 mi |
| #92623 | 138 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 14.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of HOWARD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| SKYLINE | Substation-Adjacent | TX | Bexar County | 345 kV | 600 MW | 3.4 yrs | 75.7 |
| ARTHUR VON ROSENBERG | Substation-Adjacent | TX | Bexar County | 345 kV | 600 MW | 3.4 yrs | 75.1 |
| CAGNON ROAD | Substation-Adjacent | TX | Bexar County | 345 kV | 600 MW | 3.4 yrs | 74.8 |
| CALAVERAS 345 SWITCHYARD | Substation-Adjacent | TX | Bexar County | 345 kV | 600 MW | 3.4 yrs | 74.7 |
| HILL COUNTRY 345 | Substation-Adjacent | TX | Bexar County | 345 kV | 600 MW | 3.4 yrs | 73.9 |
| TRUMBO | Substation-Adjacent | TX | Bexar County | 345 kV | 600 MW | 3.4 yrs | 73.1 |
| J T Deely | Brownfield | TX | Bexar | — | 932 MW | — | 71.8 |
| LEON CREEK | Substation-Adjacent | TX | Bexar County | 345 kV | 600 MW | 3.4 yrs | 71.7 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for HOWARD substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.