HONDO CREEK

Substation

Texas · AEP TEXAS CENTRAL COMPANY

Max voltage
138
kV

HONDO CREEK is an electric transmission substation in Texas, operated by AEP TEXAS CENTRAL COMPANY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorAEP TEXAS CENTRAL COMPANY
Co-ownerBANDERA ELECTRIC COOP, INC
StateTexas
Coordinates29.2724, -99.0844

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#88962138 kVBANDERA ELECTRIC COOP, INC9.3 mi
#89889138 kVAEP TEXAS CENTRAL COMPANYIN SERVICE14.1 mi
#92133138 kVBANDERA ELECTRIC COOP, INCIN SERVICE9.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HONDO CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HONDO CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CAGNON ROADSubstation-AdjacentTXBexar County345 kV600 MW3.4 yrs74.8
RANCHTOWNSubstation-AdjacentTXBexar County138 kV100 MW3.4 yrs69.1
TEXAS RESEARCHSubstation-AdjacentTXBexar County138 kV100 MW3.4 yrs68.6
CASTROVILLESubstation-AdjacentTXMedina County138 kV100 MW3.4 yrs68.1
TALLEY ROADSubstation-AdjacentTXBexar County138 kV100 MW3.4 yrs67.6
WESTOVER HILLSSubstation-AdjacentTXBexar County138 kV100 MW3.4 yrs67.3
LYTLESubstation-AdjacentTXMedina County138 kV100 MW3.4 yrs67.2
TAP307847Substation-AdjacentTXMedina County138 kV100 MW3.4 yrs66.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HONDO CREEK substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.