HIGHWAY 32

Substation

Texas · PEDERNALES ELECTRIC COOP, INC

Max voltage
138
kV

HIGHWAY 32 is an electric transmission substation in Texas, operated by PEDERNALES ELECTRIC COOP, INC. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorPEDERNALES ELECTRIC COOP, INC
StateTexas
Coordinates29.9458, -98.0936

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#84387138 kVPEDERNALES ELECTRIC COOP, INCIN SERVICE6.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HIGHWAY 32, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HIGHWAY 32 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SKYLINESubstation-AdjacentTXBexar County345 kV600 MW3.4 yrs75.7
Guadalupe Generating StationBrownfieldTXGuadalupe320 MW72.6
MARIONSubstation-AdjacentTXGuadalupe County345 kV600 MW3.4 yrs72.4
PEDERNALESSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs71.5
CLEAR SPRINGSSubstation-AdjacentTXGuadalupe County345 kV600 MW3.4 yrs71.1
RIO NOGALES SWITCHYARDSubstation-AdjacentTXGuadalupe County345 kV600 MW3.4 yrs70.8
ZORNSubstation-AdjacentTXGuadalupe County345 kV600 MW3.4 yrs70.0
CAPITOL CEMENTSubstation-AdjacentTXBexar County138 kV100 MW3.4 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.