HERRING

Substation

Texas · NORTH PLAINS ELECTRIC COOP INC

Max voltage
115
kV

HERRING is an electric transmission substation in Texas, operated by NORTH PLAINS ELECTRIC COOP INC. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

OperatorNORTH PLAINS ELECTRIC COOP INC
StateTexas
Coordinates35.8289, -101.5498

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83794115 kVNORTH PLAINS ELECTRIC COOP INCIN SERVICE4.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HERRING, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HERRING substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MOORE COUNTYSubstation-AdjacentTXMoore County230 kV300 MW3.4 yrs67.8
PRINGLESubstation-AdjacentTXHutchinson County230 kV300 MW3.4 yrs65.8
Greenfield (POTTER COUNTY - HITCHLAND)GreenfieldTXPotter County345 kV600 MW3.4 yrs65.3
Greenfield (POTTER COUNTY - HITCHLAND)GreenfieldTXPotter County345 kV600 MW3.4 yrs65.2
FAINSubstation-AdjacentTXPotter County115 kV100 MW3.4 yrs64.4
Greenfield (MOORE COUNTY - POTTER COUNTY)GreenfieldTXPotter County230 kV300 MW3.4 yrs64.2
TAP310855Substation-AdjacentTXHutchinson County230 kV300 MW3.4 yrs64.1
TAP305332Substation-AdjacentTXMoore County115 kV100 MW3.4 yrs64.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HERRING substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.