GRAPEVINE

Substation

Texas · GREENBELT ELECTRIC COOP, INC

Max voltage
230
kV

GRAPEVINE is an electric transmission substation in Texas, operated by GREENBELT ELECTRIC COOP, INC. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorGREENBELT ELECTRIC COOP, INC
Co-ownerSOUTHWESTERN PUBLIC SERVICE CO.
StateTexas
Coordinates35.4019, -100.8910

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#83486230 kVGREENBELT ELECTRIC COOP, INCIN SERVICE36.8 mi
#84776230 kVSOUTHWESTERN PUBLIC SERVICE CO.IN SERVICE4.0 mi
#85860230 kVSOUTHWESTERN PUBLIC SERVICE CO.IN SERVICE52.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GRAPEVINE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GRAPEVINE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RAILHEADSubstation-AdjacentTXCarson County345 kV600 MW3.4 yrs69.0
GRAYSubstation-AdjacentTXGray County345 kV600 MW3.4 yrs68.6
GRAPEVINESubstation-AdjacentTXGray County230 kV300 MW3.4 yrs67.9
BOWERSSubstation-AdjacentTXGray County230 kV300 MW3.4 yrs66.8
JACK RAMEY WINDSubstation-AdjacentTXCarson County345 kV600 MW3.4 yrs66.4
UNKNOWN308238Substation-AdjacentTXGray County230 kV300 MW3.4 yrs66.4
SALT FORK WINDSubstation-AdjacentTXDonley County345 kV600 MW3.4 yrs64.9
Greenfield (ALIBATES - GRAY)GreenfieldTXGray County345 kV600 MW3.4 yrs63.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen