GLADSTONE
SubstationTexas
GLADSTONE is an electric transmission substation in Texas. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #86549 | 230 kV | — | — | 116.5 mi |
| #81889 | 115 kV | — | IN SERVICE | 44.5 mi |
| #87835 | 115 kV | — | IN SERVICE | 31.8 mi |
| #92588 | 115 kV | — | IN SERVICE | 35.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of GLADSTONE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| GLADSTONE | Substation-Adjacent | NM | Union County | 230 kV | 300 MW | 3.4 yrs | 59.9 |
| Greenfield (WALSENBURG - GLADSTONE) | Greenfield | NM | Union County | 230 kV | 300 MW | 3.4 yrs | 59.7 |
| Greenfield (WALSENBURG - GLADSTONE) | Greenfield | NM | Colfax County | 230 kV | 300 MW | 3.4 yrs | 58.6 |
| Greenfield (WALSENBURG - GLADSTONE) | Greenfield | NM | Union County | 230 kV | 300 MW | 3.4 yrs | 57.0 |
| Greenfield (WALSENBURG - GLADSTONE) | Greenfield | NM | Union County | 230 kV | 300 MW | 3.4 yrs | 55.4 |
| Greenfield (SPRINGER - GLADSTONE) | Greenfield | NM | Colfax County | 115 kV | 100 MW | 3.4 yrs | 53.6 |
| Greenfield (GLADSTONE - CLAPHAM) | Greenfield | NM | Union County | 115 kV | 100 MW | 3.4 yrs | 52.4 |
| Greenfield (SPRINGER - GLADSTONE) | Greenfield | NM | Colfax County | 115 kV | 100 MW | 3.4 yrs | 52.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for GLADSTONE substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.