FULTON (AR) is an electric transmission substation in Texas, operated by ENTERGY ARKANSAS INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorENTERGY ARKANSAS INC
StateTexas
Coordinates33.6140, -93.7737

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18859115 kV0.1 mi
#21728115 kVENTERGY ARKANSAS INCIN SERVICE15.1 mi
#33849115 kVIN SERVICE3.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FULTON (AR), ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FULTON (AR) substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN301051Substation-AdjacentARMiller County345 kV600 MW3.4 yrs72.6
UNKNOWN123543Substation-AdjacentARHempstead County345 kV600 MW3.4 yrs71.7
TAP150157Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs70.5
UNKNOWN108045Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs70.3
UNKNOWN108048Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs70.1
TAP308045Substation-AdjacentARMiller County345 kV600 MW3.4 yrs69.8
Greenfield (UNKNOWN123543 - NORTHWEST TEXA)GreenfieldARHempstead County345 kV600 MW3.4 yrs68.9
UNKNOWN108046Substation-AdjacentARHempstead County115 kV100 MW3.4 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FULTON (AR) substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.