FRIONA RURAL

Substation

Texas · SOUTHWESTERN PUBLIC SERVICE CO.

Max voltage
138
kV

FRIONA RURAL is an electric transmission substation in Texas, operated by SOUTHWESTERN PUBLIC SERVICE CO.. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorSOUTHWESTERN PUBLIC SERVICE CO.
StateTexas
Coordinates34.6074, -102.7278

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#85007138 kVSOUTHWESTERN PUBLIC SERVICE CO.IN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FRIONA RURAL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FRIONA RURAL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN303131Substation-AdjacentTXBailey County115 kV100 MW3.4 yrs64.6
HEREFORD SOUTHSubstation-AdjacentTXDeaf Smith County138 kV100 MW3.4 yrs64.6
DEAF SMITH METERING STATIONSubstation-AdjacentTXDeaf Smith County115 kV100 MW3.4 yrs64.3
UNKNOWN305098Substation-AdjacentTXDeaf Smith County115 kV100 MW3.4 yrs64.2
DEAF SMITHSubstation-AdjacentTXDeaf Smith County230 kV300 MW3.4 yrs64.0
TAP310905Substation-AdjacentTXCastro County138 kV100 MW3.4 yrs64.0
CASTRO COUNTYSubstation-AdjacentTXCastro County138 kV100 MW3.4 yrs63.9
UNKNOWN300243Substation-AdjacentTXParmer County115 kV100 MW3.4 yrs62.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FRIONA RURAL substation, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.